Case Studies

Screenshot 2025 11 10 115805
We rapidly secured and delivered the specific polycarbonate grade that a medical manufacturer urgently needed - mobilising UK stock, sourcing additional material from across Europe and ensuring uninterrupted production despite a global shortage.
electronics polymer
A leading wearable-electronics manufacturer transformed the consistency, durability and appearance of a high-performance polymer component by switching to a specific masterbatch solution recommended by Hardie Polymers - achieving uniform colour, stronger parts, reduced waste and significantly improved production reliability.
Screenshot 2025 11 10 115805
A global medical manufacturer turned to Hardie Polymers to strengthen its material supply chain. By implementing a dual-sourcing strategy, we helped ensure continuous availability of critical polymer materials and reduced operational risk.
agentdraw_logo
We've worked to support the team at Agentdraw for more than six years, developing a strong working relationship that sees us deliver fast, cost-effective solutions for the best available products – backed by the technical expertise of our in-house team.
MGS Injection Moulders
Having worked together for around eight years, MGS approached us with a project requiring one of the highest performance polymers available, but in a regrind version. It was vital to ensure the quality of product and costing was right.
hymid logo
We've worked hard to develop our supplier relationship with Hymid throughout the last decade. So when the team approached us to source materials on a short lead time, sometimes in low quantities, to ensure continuity of supply to its customers, we jumped to the challenge.

Reach out and we can discuss how we can help you manufacture on time and on budget.

You can reach us by phone on
+44 (0)141 952 1900

What is your polymer challenge?

Please fill out the form below to see if we can help with your polymer challenge.

Here are a few examples:

  • I have been given a lead time of 12 weeks for material but need it in 2 weeks
  • I only need 250kg but the MOQ is 2 pallets
  • I need a material that can operate in a high temperature environment for a prolonged period of time